Key Takeaways
- Mold maintenance is not optional. Regular maintenance extends mold life by 2x or more.
- Define responsibility in the contract. Who pays for what — routine maintenance, repairs, rebuilds — must be clear.
- Track shots and maintenance records. You can’t manage what you don’t measure.
- Know the failure modes. Wear, fatigue, corrosion, damage — each has different causes and prevention.
- Repair vs. replace is a business decision. Compare repair cost, new mold cost, and remaining volume.
- End-of-life planning matters. Know what you will do with the mold when production ends — storage, transfer, disposal.
1. Introduction: Tooling Is an Asset That Needs Care
Your production tooling — molds, dies, fixtures, jigs — is one of your most valuable manufacturing assets. A well-designed, well-built mold can produce hundreds of thousands or even millions of quality parts. A neglected mold can fail early, costing you tens of thousands of dollars in repairs, lost production, and quality problems.
Yet many foreign companies pay little attention to mold maintenance. They build the mold, start production, and assume it will just keep working — until it doesn’t. Then they are faced with unexpected downtime, repair costs, and quality issues that could have been prevented.
In China, where many factories operate on thin margins, mold maintenance is one of the areas where corners are most often cut. A factory that is not properly motivated may skip or delay maintenance to save time and money — and the result is premature mold wear and shorter tool life. If you own the tooling, this is your loss.
He Qianggao, a senior lawyer at Geason Law Offices with over 10 years of experience in Chinese manufacturing (license 14403201310092337), has seen many mold disputes: “We had a client whose mold was supposed to be good for 500,000 shots. After 200,000 shots, the mold was producing parts with excessive flash and dimensional problems. The factory said it was ’normal wear’ and wanted the client to pay $25,000 for a mold rebuild. But when we looked at the maintenance records, we found the factory had been doing minimal maintenance — no regular teardown inspections, worn ejector pins were not replaced, cooling channels were never cleaned. It was not normal wear — it was neglect. The contract was vague on maintenance responsibilities, so it took months of negotiation to resolve. Clear maintenance provisions would have prevented the entire dispute.”
This guide covers mold maintenance and tooling lifecycle management for Chinese manufacturing. It explains maintenance procedures and schedules, common failure modes, repair and refurbishment options, end-of-life decisions, and how to structure maintenance responsibilities in your manufacturing contract. Whether you own your tooling or the factory does, understanding mold maintenance will help you maximize tool life and minimize costs.
2. Why Mold Maintenance Matters
2.1 The Cost of Neglect
Skipping or skimping on mold maintenance costs you money in several ways:
- Shorter mold life. A poorly maintained mold might last 50% less than a well-maintained one. For a $50,000 mold, that is $25,000 of lost value.
- Quality problems. Worn molds produce parts with flash, dimensional variation, surface defects, and ejection marks. More defects = higher scrap rate = higher cost.
- Downtime. Unexpected mold failures stop production. Emergency repairs take longer and cost more than planned maintenance.
- Increased cycle time. Worn cooling systems and sticky ejection slow down the cycle. Slower cycle = higher per-unit cost.
- Repair costs. Emergency repairs are more expensive than preventive maintenance. Major rebuilds cost much more than regular upkeep.
2.2 The Benefits of Good Maintenance
- Longer mold life. 20-100% longer life compared to neglected molds.
- Consistent quality. Parts from a well-maintained mold are consistently within spec.
- Faster cycle times. Clean cooling systems and smooth ejection keep cycles optimized.
- Fewer unexpected breakdowns. Most problems are caught and fixed during planned maintenance.
- Lower total cost. The cost of regular maintenance is much less than the cost of neglect.
2.3 Typical Mold Lifespan
These are rough guidelines for injection molds — actual life depends on many factors:
| Mold Type / Steel | Typical Shot Life | Notes |
|---|---|---|
| Aluminum / soft tool | 10K - 50K shots | Prototype or low volume only |
| P20 steel | 100K - 500K shots | Most common production tooling steel |
| NAK80 / S136 (prehardened) | 300K - 1M shots | Better wear resistance, good polish |
| H13 / D2 (hardened) | 500K - 2M+ shots | High volume, abrasive materials |
| With excellent maintenance | +30-100% life | Regular maintenance extends life significantly |
| With poor maintenance | -30-60% life | Neglect drastically shortens life |
Factors that reduce mold life:
- Abrasive materials (glass-filled, mineral-filled plastics)
- Corrosive materials (PVC, POM, certain flame retardants)
- High molding temperatures
- Poor maintenance
- High-speed production without proper cooling
- Improper operation (crashing the mold, excessive clamp force)
- Complex part geometry (sharp corners, thin steel)
3. Mold Maintenance Procedures
3.1 Daily / Shift Maintenance
Performed by the molding machine operator or mold technician:
- Mold surface cleaning. Wipe or clean the cavity and core surfaces at the end of each shift or when changing materials. Removes residue, grease, and debris.
- Lubrication. Light lubrication of guide pins, bushings, and ejector system.
- Visual inspection. Check for obvious damage: cracks, chips, scratches, broken pins.
- Ejection system check. Verify ejector pins move smoothly, no bent or broken pins.
- Cooling system check. Verify water lines are connected and flowing properly. Check for leaks.
- Clamping force verification. Ensure proper clamping force (not too much or too little).
3.2 Weekly / Bi-Weekly Maintenance
More thorough inspection and cleaning:
- Detailed surface cleaning. Use appropriate mold cleaners to remove all residue and buildup.
- Venting inspection. Check vents for clogging — clean if needed.
- Ejector system inspection. Check all ejector pins, sleeves, and blades for wear, bending, or breakage. Replace as needed.
- Guide system inspection. Check guide pins and bushings for wear. Lubricate properly.
- Cooling system check. Check flow rate and temperature differential. Flush if needed.
- Fastener check. Tighten any loose screws or bolts.
3.3 Major Preventive Maintenance (Every 50K-100K Shots)
Complete teardown and inspection of the entire mold:
- Disassemble the mold completely
- Inspect all components for wear:
- Cavity and core surfaces — wear, scratches, corrosion, cracks
- Ejector pins, sleeves, blades — wear, bending, galling
- Guide pins and bushings — wear, galling, alignment
- Sprue bushing, gate inserts — wear, erosion
- Slides and lifters — wear, proper movement
- O-rings and seals — deterioration, leaks
- Springs — fatigue, loss of tension
- Cooling channels — scale, corrosion, flow restriction
- Replace worn or damaged parts — ejector pins, O-rings, springs, bushings, etc.
- Clean and polish cavity and core surfaces as needed
- Clean cooling channels — descale if needed
- Reassemble and test — verify proper operation, cycle time, and part quality
- Document everything — what was inspected, what was replaced, condition assessment, shot count
3.4 Cooling System Maintenance
The cooling system is critical to cycle time and part quality. Over time, cooling channels can become clogged with scale, rust, or sediment — reducing cooling efficiency and lengthening cycle time.
Cooling system maintenance:
- Regular flow monitoring. Check cooling water flow rate and temperature difference. A drop in flow or smaller temperature difference indicates clogging.
- Periodic flushing. Flush cooling channels with clean water or descaling solution.
- Use treated water. Filtered or treated cooling water reduces scale buildup.
- Corrosion inhibitor. Add corrosion inhibitor to the cooling water for long-stored molds.
- Drain and dry before long-term storage.
4. Common Mold Failure Modes
4.1 Wear
Surface wear on cavity/core:
- Caused by: material flowing across the surface, especially with abrasive fillers (glass fiber, mineral)
- Effects: surface finish degradation, dimensional change, increased ejection force
- Prevention: use harder mold steel, proper surface treatment (nitriding, plating), regular polishing
- Repair: polish or re-grind the surface, re-texture if needed
Ejector pin wear:
- Caused by: friction, misalignment, thermal cycling
- Effects: galling, sticking, pin breakage, ejection marks on parts
- Prevention: proper lubrication, correct alignment, use of wear-resistant pin materials
- Repair: replace worn pins and bushings
Guide pin/bushing wear:
- Caused by: friction, misalignment, side forces from unbalanced filling
- Effects: mold misalignment, flash, damage to cavity surfaces
- Prevention: proper lubrication, balanced gating, correct alignment during setup
- Repair: replace worn guide pins and bushings
Gate/runners wear:
- Caused by: high-velocity material flow, especially with abrasive materials
- Effects: gate erosion, larger gate size, increased material waste
- Prevention: use gate inserts of harder material, proper gate design
- Repair: replace gate inserts, re-polish runners
4.2 Fatigue and Cracking
Thermal fatigue:
- Caused by: repeated heating and cooling cycles
- Effects: fine cracks on the mold surface (heat checking), surface defects on parts
- More common in: hot runner molds, high-temperature materials, molds with sharp corners
- Prevention: proper mold design (rounded corners), preheating, stress-relieved steel
- Repair: weld and re-polish (if caught early), or replace insert
Mechanical fatigue:
- Caused by: repeated mechanical stress (clamping, ejection, side actions)
- Effects: cracks in high-stress areas, eventual mold failure
- Prevention: proper mold design, adequate steel thickness, correct clamping force
- Repair: depends on location and severity — welding, inserts, or mold replacement
4.3 Corrosion
- Caused by: corrosive plastics (PVC, acetal, flame-retardant materials), moisture in cooling channels, improper storage
- Effects: pitting on mold surfaces, rough surface finish, cooling system degradation
- Prevention: use corrosion-resistant steel (S136, 420SS), chrome plating, proper storage, cooling water treatment
- Repair: polish out light corrosion, re-plate, or replace affected inserts
4.4 Damage from Handling and Operation
- Mold crashes. Accidental closing of the mold with an object or part inside. Causes severe damage.
- Ejection damage. Parts sticking and being forcibly ejected.
- Handling damage. Damage during installation, removal, or storage.
- Over-clamping. Too much clamping force causes mold deflection and wear.
Prevention:
- Proper operator training
- Mold protection settings on the machine
- Careful handling procedures
- Correct clamping force calculation
5. Maintenance Responsibilities and Contracts
5.1 Who Is Responsible?
This should be clearly defined in your manufacturing contract. Common models:
Model 1: Factory responsible for everything
- Factory handles all maintenance and repairs
- Cost is included in the per-unit price
- Factory owns the tooling or is fully responsible for its upkeep
- Pros: Simple, predictable cost
- Cons: Factory may cut corners on maintenance to save money; you have less control
Model 2: Buyer owns tooling, factory does routine maintenance
- Buyer owns the tooling
- Factory performs routine maintenance (daily/weekly) at their cost
- Major repairs and rebuilds are buyer’s cost (or factory’s if caused by negligence)
- Pros: Clear ownership, you control major decisions
- Cons: You need to budget for maintenance and repairs
Model 3: Buyer pays for all maintenance
- Buyer owns tooling and pays for all maintenance and repairs
- Factory performs the work at buyer’s expense
- Pros: Maximum control, you decide what gets done
- Cons: More administration, unpredictable costs
5.2 Essential Contract Provisions
Your manufacturing contract should include clear provisions on mold maintenance:
Maintenance schedule and standards
- Specify the minimum maintenance frequency and procedures
- Reference industry standards or your maintenance specification
Maintenance records
- Factory must keep detailed maintenance records
- You have the right to review records at any time
- Records should include: date, work performed, parts replaced, shot count, mold condition assessment
Cost allocation
- Who pays for routine maintenance?
- Who pays for repairs due to normal wear?
- Who pays for repairs due to factory negligence or improper operation?
- Who pays for repairs due to design defects or buyer’s instructions?
Shot count tracking
- Factory must track the number of shots produced
- Regular reporting to buyer
- Maintenance at specified shot intervals
Mold condition reporting
- Regular mold condition assessments (e.g., quarterly or every X shots)
- Notification of any issues or expected maintenance needs
Improper operation
- Factory is responsible for damage caused by improper operation, negligence, or operator error
- This includes mold crashes, over-clamping, incorrect settings
5.3 The Importance of Records
Maintenance records are essential for:
- Tracking mold condition and remaining life
- Budgeting for repairs and replacement
- Resolving disputes about maintenance responsibility
- Proving proper maintenance if quality issues arise
- Planning for end-of-life replacement
Make sure your contract gives you the right to inspect both the mold and the maintenance records.
6. Mold Repair and Refurbishment
6.1 Types of Mold Repair
Minor repairs (during production):
- Replacing broken ejector pins
- Replacing worn O-rings or seals
- Minor polishing or cleaning
- Tightening loose components
- Usually done during regular maintenance or short stops
Major repairs:
- Welding and repairing cracks or damage
- Replacing worn inserts or core pins
- Re-grinding and re-polishing worn surfaces
- Replacing guide pins and bushings
- Rebuilding slide or lifter mechanisms
- May require taking the mold out of production for days to weeks
Full rebuild / refurbishment:
- Complete teardown and inspection
- Replacement of all worn components
- Re-machining or re-polishing of cavity/core
- Cooling system rebuild
- Essentially restoring the mold to like-new condition
- Cost: 30-70% of a new mold, depending on condition
- Extends life by 50-100%
6.2 Repair vs. Replace Decision
When a mold has significant wear or damage, you face a decision: repair it or build a new mold?
Factors to consider:
| Factor | Favors Repair | Favors Replacement |
|---|---|---|
| Cost | Repair cost < 50-60% of new mold cost | Repair cost > 60-70% of new mold cost |
| Remaining volume | Low remaining production volume | High remaining production volume |
| Mold age | Young mold with isolated damage | Old mold with widespread wear |
| Time | Need parts quickly (repair is usually faster) | Have time to build new mold |
| Design changes needed | No design changes needed | Opportunity to improve design |
| Quality issues | Repair will restore acceptable quality | Repair won’t fully fix the problems |
Rule of thumb: If repair cost is more than 60-70% of a new mold cost, and you have significant remaining volume, it is usually better to build a new mold.
6.3 Common Repair Techniques
Mold welding (tool welding):
- Filling cracks, worn areas, or damage with weld material
- Then machining and polishing back to the original shape
- Cost-effective for repairing localized damage
- Must be done by skilled mold welders with proper equipment
Insert replacement:
- Replacing worn or damaged inserts with new ones
- Common for gates, cores, slides, and high-wear areas
- Good design practice uses replaceable inserts for high-wear areas
Re-polishing and surface treatment:
- Re-polishing worn surfaces to restore finish and dimension
- Re-applying surface treatments (nitriding, chrome plating, PVD coatings)
- Can restore worn surfaces if the wear is not too deep
Cooling system repair:
- Descaling and cleaning cooling channels
- Repairing leaks
- Replacing cooling lines if badly corroded
7. End-of-Life Tooling Management
7.1 Signs It Is Time to Retire the Mold
- Quality is declining and repairs can no longer maintain acceptable quality
- Maintenance and repair costs are eating into your margin
- Cycle time has increased significantly due to worn cooling or ejection
- The product is reaching end of life and you won’t need more parts
- You are switching factories and need to decide what to do with the tooling
7.2 Options for End-of-Life Tooling
1. Store it
- Keep the mold in storage in case you need more parts later
- Cost: storage fees (if using outside storage) + maintenance during storage
- Good for: products that may have repeat orders or spare parts needs
- Consider: how long will you store it? What is the annual storage cost? Will the mold still be good when you need it?
2. Transfer it
- Move the mold to a different factory
- Good for: switching suppliers, consolidating production, or moving to a lower-cost factory
- Consider: mold condition, transfer cost, setup time at the new factory, risk of damage during transfer
3. Sell or scrap it
- Sell the mold (if someone else can use it) or sell it for scrap value
- Good for: products that are definitely end-of-life, no future need
- Consider: scrap value is usually very low (just the steel value)
- Important: if the mold embodies your proprietary design, make sure it is properly destroyed or the buyer is vetted
4. Donate or repurpose
- Donate to a school or training center
- Use for display or trade show purposes
- Repurpose for a different (but similar) product (with modifications)
7.3 Long-Term Mold Storage
If you store a mold for future use:
Before storage:
- Clean the mold thoroughly
- Apply rust inhibitor or protective coating
- Drain and dry cooling channels
- Lubricate all moving components
- Wrap or package the mold properly
- Document the mold condition before storage
During storage:
- Store in a dry, temperature-controlled environment if possible
- Periodic inspection (every 6-12 months)
- Reapply protective coatings as needed
- Keep maintenance records and storage documentation
After storage / before use:
- Thorough inspection
- Clean and re-lubricate
- Test on a machine before production
- Expect some startup time and possible minor repairs
8. Key Takeaways
Mold maintenance is one of the most important — and most often neglected — aspects of manufacturing. Your tooling is a valuable asset, and proper maintenance protects that investment. Whether you own the tooling or the factory does, understanding maintenance requirements and clearly defining responsibilities will save you money and prevent disputes.
Core principles:
- Maintenance pays for itself. Regular maintenance extends mold life, improves quality, and prevents costly breakdowns.
- Define responsibilities clearly. Who does what, who pays for what — put it in the contract.
- Track everything. Shot counts, maintenance records, repair history — you need this data to manage the asset.
- Know the failure modes. Wear, fatigue, corrosion, damage — understand what can go wrong and how to prevent it.
- Repair vs. replace is a business decision. Compare costs, remaining volume, and timeline.
- Plan for end of life. Know what you will do with the mold when production ends — storage, transfer, or disposal.
- If you own it, manage it. Tooling ownership means you are responsible for its upkeep. Don’t just assume the factory will take proper care of it.
At Geason Law Offices, we help foreign hardware companies structure tooling ownership and maintenance agreements, manage mold disputes, and protect their tooling assets. He Qianggao and our manufacturing team bring over a decade of experience to help you get the most value from your tooling investment.
FAQ
Q1: What quality control standards apply to manufactured goods in China?
A1: China has a comprehensive system of quality standards including national standards (GB), industry standards, local standards, and enterprise standards. For many consumer products, compliance with GB standards is mandatory. Products sold in China may also require CCC (China Compulsory Certification) marking depending on the product category. For export products, manufacturers must meet the standards of the destination country. China’s Product Quality Law establishes manufacturer liability for defective products, including compensation for damages caused by quality issues.
Q2: What is the difference between OEM and ODM arrangements in China?
A2: OEM (Original Equipment Manufacturing) involves a foreign brand providing product specifications and designs to a Chinese factory that manufactures according to those exact specifications. ODM (Original Design Manufacturing) involves the Chinese factory both designing and manufacturing the product, with the foreign brand typically putting its own label on the finished product. The key legal differences relate to intellectual property ownership, liability for design defects, and the degree of control the brand has over the manufacturing process and quality standards.
Q3: What are the key labor law requirements for manufacturing facilities in China?
A3: Manufacturing facilities in China must comply with comprehensive labor requirements including standard working hours (40 hours/week), overtime pay (150% on weekdays, 200% on rest days, 300% on statutory holidays), mandatory social insurance contributions (pension, medical, unemployment, work injury, maternity), written employment contracts within 30 days of hiring, and workplace safety standards under the Work Safety Law. For factories using dispatch workers, the total proportion of dispatched workers cannot exceed 10% of the total workforce.
Q4: How do I protect my IP when manufacturing in China?
A4: Protecting IP in Chinese manufacturing requires a multi-layered approach: registering trademarks, patents, and copyrights in China (not just in your home country), executing comprehensive manufacturing agreements with clear IP ownership provisions and confidentiality clauses, implementing supply chain controls to prevent overproduction and gray market diversion, conducting regular factory audits, and registering IP with China Customs to prevent unauthorized exports. It’s also important to conduct thorough due diligence on manufacturing partners and to structure agreements with clear dispute resolution mechanisms, preferably with Chinese court jurisdiction or arbitration in China.
Q5: How does China’s environmental regulation affect manufacturing operations?
A5: China’s environmental regulations have become increasingly stringent, particularly under the Environmental Protection Law and the “Dual Carbon” goals. Manufacturing facilities must obtain environmental impact assessments (EIA) before construction, install pollution control equipment, meet emission standards, and participate in the emissions trading system for certain pollutants. Violation penalties have increased significantly and can include daily fines, production suspensions, and even criminal liability for serious environmental pollution incidents.
Further Reading
- Tooling Cost in China: A Complete Guide to Mold Pricing, Payment and Ownership — Tooling cost and ownership
- Tooling Ownership & Mold IP Protection in China Manufacturing Contracts — Tooling IP and ownership
- Injection Molding in China: A Complete Guide for Hardware Startups — Injection molding
- China Manufacturing Contracts: A Guide for Foreign Hardware Companies — Contract essentials
Next Steps
Whether you are setting up a new tool or managing existing molds, understanding maintenance requirements and clearly defining responsibilities will protect your tooling investment and prevent costly disputes.
Two service lines most relevant for mold maintenance and tooling management:
- Commercial Contracts & Manufacturing Agreements — Tooling and maintenance clauses
- Manufacturing Legal Support in China — Full manufacturing legal support
To discuss mold maintenance or tooling management for your China manufacturing, Contact Geason Law Offices. The initial consultation is free; the form prepares an email in your own mail application.
Related guides in this series
- NPI Process in China: From Prototype to Mass Production
- Quality Control in China Hardware: Inspection, Testing and Defect Prevention
- Supplier Relationship Management & KPIs: Getting the Best from Chinese Factories
Frequently Asked Questions↑ Back to article
How long does an injection mold last in China manufacturing?
Mold lifespan depends on material, part complexity, maintenance, and production volume. Typical lifespans: (1) Prototype/soft tooling (aluminum or P20 steel): 10,000-50,000 shots, (2) Production tooling (P20, S136, NAK80 steel): 100,000-500,000 shots, (3) High-hardness tooling (H13, D2, S136 hardened): 500,000-2,000,000+ shots, (4) High-volume hardened tooling with regular maintenance: 2-5 million shots possible. With proper maintenance, molds can last much longer than the rated lifespan. Poor maintenance can cut mold life in half or worse. The actual number depends heavily on part complexity, material type (abrasive materials like glass-filled nylon wear molds faster), and maintenance quality.
What does mold maintenance include and how often should it be done?
Mold maintenance includes: (1) Daily/shift-level: cleaning the mold surface, checking for damage, lubricating guide pins and bushings, (2) Weekly: more thorough cleaning, inspection of cooling system, ejector system check, (3) Monthly / every X shots: complete teardown inspection, wear assessment, replacement of worn parts (sprue bushing, O-rings, ejector pins), (4) Preventive maintenance cycles: every 50K-100K shots for production tooling. The exact schedule depends on: mold material, part material (abrasive materials need more frequent maintenance), production volume, mold complexity, and quality requirements. A good rule of thumb: production tooling should have major maintenance every 50,000-100,000 shots, plus regular daily/weekly cleaning.
Who is responsible for mold maintenance costs?
This should be clearly defined in your manufacturing contract. Common arrangements: (1) Factory pays for routine maintenance — included in the per-unit price (most common), (2) Buyer pays for major repairs and rebuilds — because the buyer owns the tooling, (3) Shared — routine maintenance is factory's cost, damage from factory negligence is factory's cost, normal wear replacement is shared or buyer's cost. The key is to have it in writing. If you own the tooling, you should budget for maintenance and repair costs — typically 5-15% of the original tooling cost per year, depending on volume. If the factory owns the tooling, maintenance is their problem — but they may cut corners to save money.
What are the most common mold failure modes?
Common mold failures and wear patterns: (1) Wear on cavity and core surfaces — from material flow, especially with glass-filled or abrasive materials, (2) Ejector pin wear and breakage — pins bend, wear, or break, causing cosmetic defects or ejection problems, (3) Guide pin and bushing wear — causes misalignment and flash, (4) Cooling system degradation — scale buildup in cooling channels reduces cooling efficiency, (5) Gate and runner wear — gate erosion from material flow, (6) Flash — excess material along parting lines, caused by wear or misalignment, (7) Cracks and fatigue — from repeated thermal and mechanical stress, (8) Corrosion — from certain materials (PVC, etc.) or moisture, (9) Surface damage — scratches, dents, or chips from handling or parts sticking.
How do I know when a mold needs to be replaced?
Signs that a mold is reaching end of life: (1) Quality problems increase — more flash, dimensional variation, surface defects, (2) Maintenance frequency increases — you are repairing the mold more and more often, (3) Cycle time increases — cooling is less efficient, ejection problems slow things down, (4) Repair costs approach the cost of a new mold — when annual repair costs are 30-50% of a new mold, it is time to consider replacement, (5) Dimensional drift — the mold can no longer hold tolerances, (6) Cracks or structural damage — that cannot be repaired effectively, (7) You have produced the expected number of shots and quality is declining. The decision to repair vs. replace depends on: remaining production volume, repair cost vs. new mold cost, timeline, and quality requirements.
How much should I budget for annual mold maintenance?
If you own the tooling, you should typically budget 5-15% of the original tooling cost per year for maintenance and repairs, depending on production volume, part complexity, and material type. High-volume production with abrasive materials like glass-filled nylon will be at the higher end, while lower volume with standard materials will be at the lower end. This budget covers routine maintenance, wear part replacement, and minor repairs. Major rebuilds or unexpected failures would be additional costs on top of this.
Why do some Chinese factories cut corners on mold maintenance?
Chinese factories may cut corners on mold maintenance because they operate on thin margins and maintenance takes time and resources that could be used for production. If the factory owns the tooling, they may try to minimize costs to maximise profit, especially on programs where the relationship is seen as short-term. If you own the tooling, the factory has less incentive to invest in preventive maintenance because the cost of premature failure falls on you. This is why clear maintenance provisions in your contract, regular maintenance reporting, and periodic inspections are essential for protecting your tooling investment.